ADU Builder in Bountiful, Utah
An accessory dwelling unit in Bountiful doesn’t move through a standard plan check the way it would in some neighboring Salt Lake County cities. The city’s land use ordinance requires a Conditional Use Permit for every ADU, reviewed and decided by the Bountiful City Administrative Committee rather than approved over the counter by planning staff. That single structural difference shapes the timeline, the paperwork, and what a homeowner needs to have ready before applying.
Bountiful also sits in Davis County, not Salt Lake County, which means the deed restriction tied to an approved ADU gets recorded with the Davis County Recorder’s Office rather than Salt Lake County’s. It’s a small administrative detail that trips up homeowners who’ve researched ADU rules based on a Salt Lake City or Murray example and assume the process transfers directly.
Ironwood builds ADUs in Bountiful under the same Precision Build Method used on every project, developing scope, committee requirements, and a fixed-price proposal together rather than pricing a design that hasn’t cleared local review yet. What follows covers how Bountiful’s process actually works, what the Administrative Committee looks for, and what a realistic budget looks like.
How Bountiful’s ADU Rules Differ From the Rest of the Valley
Bountiful’s ordinance, codified at Section 14-14-124 of the city’s Land Use Code, treats every ADU as a discretionary approval rather than a routine permit.
A Conditional Use Permit, Not a Simple Permit
Every accessory dwelling unit in Bountiful, whether it’s built into a basement, attached to the home, or standing as a separate structure in the backyard, requires a Conditional Use Permit approved by the Bountiful City Administrative Committee. Detached units go through the same committee specifically for approval, which means a public meeting and a staff report stand between an application and a yes, not just a plan reviewer’s checklist.
One ADU, No Separate Meters, No Separate Sale
A handful of conditions show up across Bountiful’s approved ADU applications regardless of type:
- A maximum of one accessory dwelling unit is permitted per qualifying lot
- The property owner must continuously occupy either the primary home or the ADU
- Separate utility meters are not permitted for the accessory unit
- A deed restriction confirming the ADU’s status has to be recorded with the Davis County Recorder’s Office before anyone can legally occupy the space
- Off-street parking requirements apply on top of the city’s standard parking code, and have run as high as four spaces, with at least two in a garage, on past approved applications
ADU Types Ironwood Builds in Bountiful
- Basement conversions, using an existing foundation and often an existing walkout or separate stairwell, generally the fastest path through Bountiful’s committee process since less new construction is involved
- Attached additions, connected to the main home through a shared wall but built with their own entrance, giving more design flexibility than a basement conversion
- Detached units, standing apart from the home entirely, which Bountiful’s code treats as a distinct accessory structure subject to the same Administrative Committee review as attached and internal units
Each type still needs the same Conditional Use Permit, but the committee’s questions change depending on which one is proposed, particularly around parking, setbacks, and how the structure relates to the rest of the lot.
What the Bountiful City Administrative Committee Reviews
- Owner-occupancy confirmation. The application has to establish that the owner will live in either the primary home or the ADU, a condition the city enforces through the recorded deed restriction.
- Site and parking plan. The committee looks at how the property meets Bountiful’s parking standards for the ADU in addition to the primary home, since this has been a recurring point of discussion in past committee meetings.
- Utility and structural review. Plans confirm the ADU shares utility service with the main home rather than running a separate meter, and that any structural work meets Utah’s adopted building code.
- Deed restriction preparation. Before occupancy, a restriction prepared and signed by the Bountiful City Planning Director and all property owners gets recorded with Davis County.
- Committee hearing and decision. The Administrative Committee reviews the staff report and application at a public meeting and issues its decision, which is where most ADU applications in Bountiful either move forward or get sent back for revisions.
Ironwood manages this entire sequence as part of the project rather than leaving a homeowner to assemble the application alone. For a broader look at how Utah’s state and local ADU rules interact, Utah’s Office of the Property Rights Ombudsman breaks down what cities can and can’t restrict.
Where Ironwood Builds ADUs in Bountiful, Utah
Ironwood takes on ADU projects across Bountiful’s 84010 ZIP code, from the view lots along the East Bench and Canyon Crest to the established mid-century streets of Val Verda and North Canyon. A basement ADU is often the most practical starting point on these lots, especially on an East Bench walkout that already has grade-level access, and it pairs naturally with the kind of basement finishing work we do throughout the city.
Call (801) 893-7820 to start with an initial consultation, or visit our Bountiful home page for the full range of remodeling and custom home work we do here, alongside our general ADU remodeling and new build services.
What’s Included When Ironwood Builds Your Bountiful ADU
An ADU in Bountiful is rarely just a construction project. Between the Conditional Use Permit, the deed restriction, and the city’s own code requirements, there’s a parallel track of paperwork running alongside the actual build, and Ironwood treats both as part of the same job.
- Design developed around your lot and the committee’s expectations, not a stock floor plan dropped onto the property afterward
- Preparation of the Conditional Use Permit application, including the site and parking plan the Administrative Committee will review
- Coordination of the deed restriction that has to be recorded with Davis County before anyone can legally move in
- Construction under a fixed-price proposal, developed once design, selections, and committee requirements are far enough along that the number reflects the actual project
- A single project manager who stays with the job from the first consultation through the final walkthrough
What an ADU Costs to Build in Bountiful
| ADU Type | Starting Investment |
|---|---|
| Basement conversion | $150,000 |
| Attached addition | $225,000 |
| Detached unit | $300,000 |
These figures reflect Ironwood’s $100,000 remodeling project minimum and the added scope an ADU typically carries, including kitchen or kitchenette plumbing, a full bathroom, and in Bountiful’s case, the time and documentation the Conditional Use Permit process adds before construction begins. Final numbers depend on finish level, lot conditions, and how much of the committee’s parking and site requirements the existing property already meets.
A basement ADU runs well above a standard basement finish for a reason: a straightforward basement finish doesn’t need a kitchen, a second egress-compliant bedroom, or a Conditional Use Permit, and a Bountiful ADU needs all three.
Why Bountiful Families Choose Ironwood for an ADU Project
Ironwood is led by Steve Wille and Kelly Anderson, who bring more than 70 years of combined residential construction experience to every project, including the ADU work that’s become one of the most requested projects in Bountiful’s established neighborhoods. Kelly’s seat on the Architectural Codes Council for the State of Utah means the team building your ADU is already fluent in the code questions a Conditional Use Permit application tends to raise.
A few things homeowners mention most often when they explain why they chose Ironwood for an ADU in Bountiful:
- A fixed-price proposal instead of a shifting estimate. The price you approve is the price tied to a defined, documented scope.
- One point of contact throughout the project. You’re not relaying updates between a designer, a permitting consultant, and a construction crew separately.
- Direct experience with Bountiful’s committee process. Knowing what the Administrative Committee typically asks for saves a homeowner from submitting an incomplete application and losing weeks to a resubmission.
- A one-year workmanship warranty from Substantial Completion, with manufacturer warranties still available on covered products and materials.
How Your Bountiful ADU Construction Unfolds
Once the Administrative Committee signs off and the building permit is in hand, the project shifts from paperwork to an actual build sequence, and that sequence looks a little different depending on which ADU type you’re building.
- Site and foundation work. A detached unit starts with excavation and a new foundation, while a basement conversion begins with assessing what the existing foundation and walls can support, and an attached addition ties into the home’s current foundation line.
- Framing and rough-in. Framing for new construction moves quickly once the foundation is set, and all three types require plumbing, electrical, and mechanical rough-in sized for a full kitchen or kitchenette and bathroom, since that’s what triggered the ADU classification in the first place.
- Insulation, drywall, and the separate entrance. A private entrance is one of the details Bountiful’s committee pays close attention to, so door placement and any exterior grading it requires get finalized at this stage, not adjusted after the fact.
- Cabinetry, fixtures, and finish work. Kitchen or kitchenette cabinetry goes in and gets leveled before countertop templating happens, keeping the sequence that avoids a poor countertop fit against finished cabinets.
- Utility tie-in and inspection. Since Bountiful doesn’t allow a separate meter for the ADU, final electrical and plumbing inspections confirm the unit is properly tied into the home’s existing utility service rather than running independently.
- Final walkthrough and deed restriction filing. Ironwood walks the finished space with you, and the recorded deed restriction with Davis County gets confirmed as part of closing out the project, since occupancy isn’t legal until that’s on file.
Frequently Asked Questions
Does Bountiful require a Conditional Use Permit for every ADU?
Yes. Unlike cities where an ADU moves through a standard building permit review, Bountiful requires a Conditional Use Permit approved by the Bountiful City Administrative Committee for internal, attached, and detached units alike.
Can I rent out my ADU in Bountiful?
Bountiful’s ordinance requires continuous owner occupancy of either the primary home or the ADU, which limits how the unit can be used. Confirm current rental conditions for your specific property with the city’s Planning Department before counting on rental income.
How many parking spaces does an ADU need in Bountiful?
Parking requirements apply on top of the home’s existing parking and have required as many as four total spaces, with at least two in a garage, on past Bountiful approvals. The exact number depends on the property and the committee’s review.
Can I install a separate electric or water meter for my Bountiful ADU?
No. Bountiful’s ordinance does not permit separate utility meters for an accessory dwelling unit, so the ADU shares metered utility service with the primary home.
Why does Bountiful's ADU process involve Davis County, not Salt Lake County?
Bountiful sits in Davis County, so the deed restriction required before occupying an approved ADU gets recorded with the Davis County Recorder’s Office. Homeowners researching ADU rules based on a Salt Lake County city’s process should expect this difference.